Here are images illustrating how the site has changed since 2005; the
most current images are at the top, oldest ones at the bottom.
PHOTOS _
_ _ _ ____ ----------------____________ VIDEO
Ladder Railing Installed (as designed by Jim K.)
Deck Stained, Bath Tile, Trim, Door Latches
Kitchen Backsplash/Faucet/Wetbar 10/25/08
Siding Final Pieces (peak)
Exterior_South_10/18/08
Master Bath Mirrors/Tile
Kitchen Lights, Fans 10/1808
Railings Installed
Appliances Installed Phase 1
Compass Spot
Exteriors 9/26/08
Countertops Installed
Bathroom Granite Template
Kitchen Tile Cabinets Sept. 25
Lighting Installed
Wood Floor Sept. 14
Fireplace Keystone
Exteriors Sept. 7
Wood Floor Sept. 5
Wood Floors Cabinets Fireplace Sept. 4
Wood Flooring through Aug. 29
Cabinets Installed
Driveway Poured - Phase 2
Fireplace Slate Cut---------------------------------------Video of Slate CNC 1-----CNC 2------CNC3
Driveway Poured - Phase 1------------------------------Video of Driveway Poured, Part 1
Exteriors (August 11)
Cabinets Arrive
Doors Hung (August 7)
Exteriors (August 6)
Excavating (August 3)
Sauna Trim Closet Loft Seat
Move Refrigerator
Cement Sidewalk
Interior Painting 2nd Coat
Exterior (July) with ramp
Retaining Walls Pickup (June 22) Construction (July 4)
Pegboard/Insulation Storage Room (June 22)
Interior Painting (June 16)
Exteriors (May 16)
Exteriors (May 4) Martha, Mom, Kids
Drywall hung --------------------------------------------Video of Drywall Hanging
Roofing started-------------------------------------------Video of Roofing Installed Part 1 -- Part 2
Siding (March 28)----------------------------------------Video of Siding Install
Exteriors (March 19)
Exteriors (March 14)
Exteriors (March 12)
Exteriors (March 6)
Exteriors (March 4)
Exteriors (March 20)
Foam Insulation Ceiling (March 20)----------------------Video of Insulation Sprayed
Exteriors (March 19)
Walvac/Radiant Heat (March 19)
Water Hook-up (March 19)
Siding Prep and Stain plus More Staining (March 8)
Window Seat/Tub Framing (March 2)
Basement Floor Sealed (March 3)
Exteriors/Window Seat/Can Lighting (Feb 24)
First Fire and Spiral Stair (Jan 21)-----------------------Video of Spiral Placed
Exteriors/Cleaning (Jan 20)
Fireplace/Long Wall/Cleaning (Jan 12)
Exteriors (Jan 5)
Prep for Basement Stain
Radiant Tubes Basement (Dec 27)
Basement Cement Poured (Dec 27)----------------------Video of Basement Cement Poured
Exterior Streetside (Dec 22)
Exteriors (Dec 11)
Radiant Tubes Basement (Dec 10)
Windows Installed (Dec 10)
Interiors (Dec. 9)
Final Beams and Roof SIPs (Dec 7)---------------------Video of Roof beams, first set
---------------------------------------------------------Video of Roof SIPs, streetside view
---------------------------------------------------------Video of Roof beams, second set
---------------------------------------------------------Video of Roofbeams, final set
---------------------------------------------------------Video of roof panel, #2, lifted, sealed, placed
---------------------------------------------------------Video of roof panel #1, lifted, sealed, place
---------------------------------------------------------Video of roof panel #3, placed and sealed
Interiors (Dec 3)
Interiors/Exterior Wrap (Dec 1)
Exterior
Front Porch Beams (Nov. 23)
Windows
Arrive (Nov. 21)
Exterior
Front Porch Posts (Nov. 19)
OSB
North South Roof (Nov. 14)
Interiors
(Nov. 14)
Roof
Trusses (Nov. 12)
Center
North South Walls (Nov. 11)
Center
North South Walls, Kitchen Roof Trusses
Roof
Trusses, Garage (Nov. 8)-------------------------Video of garage ridge beam
Center/West
Sloping Panels (Nov. 7)
Center
Floor OSB (Nov. 5)
Center
Walls (Nov. 3)
Center
Floor Trusses (Nov. 2)--------------------------Video of floor trusses
Posts
and Beams 1--------------------------------------Video
of beams at mill (Lake City)
---------------------------------------------------------Video of Basement Post/Beam Install
---------------------------------------------------------Video Post/beam fabrication
---------------------------------------------------------Video of great room, beam installation
Wall
7
Wall
6 and Post Fittings
Wall
5--------------------------------------------------Video of SIP panel base sealed
---------------------------------------------------------Video of SIP panel tipped into place
Walls
3 & 4---------------------------------------------Video of SIP panel assembled
---------------------------------------------------------Video of SIP panel assembled part 2
Wall
2
Wall
1
SIPS
Arrive---------------------------------------------Video of SIPs arriving and unloading
Fill
Level 5
Fill
Level 4
Geothermal
Laid----------------------------------------Video of geothermal tubing laid
Rocks
Removed
Fill,
Third Level-----------------------------------------Video of foam insulation on foundation wall, streetside view
---------------------------------------------------------Video of fill from streestide and from south side, crane in action
Fill,
Second Level, August 1, 2007----------------------Video of fill, second level, streetside
Cement
Waterproofing/Drain Tile
Cement
Poured: Frost Wall-----------------------------Video of cement pouring, streetside
---------------------------------------------------------Video of cement pouring, mediume shot
Cement
Forms Removed-------------------------------Video of foundation forms removed
Cement
Forms for Foundation Walls--------------------Video of foundation forms, streetside, wide and medium static
---------------------------------------------------------Video of foundation walls poured, medium and closeup shots
Rock
Gathering
Fill,
First Level------------------------------------------Video of fill, bulldozer leveling, streetside view
---------------------------------------------------------Video of fill, streetside, medium shot
Drainfield
& Driveway----------------------------------Video of septic digging, streetside P.O.V.
---------------------------------------------------------Video of septic tank placed
Septic tank locations (2013 pic)
Stump
Removal
Tree
Clearing, July 2007--------------------------------Video of cleared site, streetside,static
Brush
Clearing, June, 2007
Cutting
and Clearing, May, 2007
Tree
Clearing, April 2007
Meadow,
April 2007
December,
2006
January,
2005
|